  • At what stage of a project should we bring you in?

    Ideally as early as possible. 4D adds the most value during work winning and pre-construction, but we can also step in during delivery to resolve issues, optimise programmes, or support claims.

  • How does 4D add value if we already have a detailed programme?

    A written programme is hard to communicate and often open to interpretation. 4D transforms it into a clear visual sequence, making risks, clashes, and opportunities immediately visible to everyone.

  • Do you only work on large-scale projects, or can smaller schemes benefit too?

    We support projects of all sizes. Even smaller schemes gain from clearer logistics, stronger stakeholder communication, and better programme certainty.

  • How does your approach differ from what our planners or consultants already provide?

    We don’t replace planners—we empower them. Our 4D approach connects programme, design, and logistics into one visual environment, unlocking insights traditional planning can’t provide.

  • How do you work with our existing project team and supply chain?

    We embed ourselves into your team, running collaborative workshops and engaging directly with subcontractors where needed. Our role is to bring clarity, not add complexity.

  • Do you run workshops directly with subcontractors?

    Yes. Subcontractors often benefit the most from 4D Planning. It helps align their work with the wider programme and highlights issues before they reach site.

  • How does 4D help us avoid delays and manage programme risk?

    By rehearsing construction before work begins, risks are spotted early and options tested digitally. This avoids costly surprises and ensures a more predictable programme.

  • Can you track progress during construction and report against the baseline?

    Yes. We update the 4D model with live site data, giving you a visual progress tracker and clear reporting against the baseline programme.

  • What evidence can you provide to support claims or disputes?

    4D provides objective, visual records of planned vs actual sequences. This clarity strengthens your position in negotiations and helps disputes resolve faster.

  • Will 4D help us win more work at bid stage?

    Yes. A well-prepared 4D model showcases your strategy, demonstrates clarity of thought, and gives clients confidence in your delivery approach—often tipping the scales in competitive tenders.

  • How do you tailor your approach for different sectors?

    We adapt our methods to suit your industry. Whether it’s commercial, residential, or infrastructure, our team brings relevant experience and bespoke solutions.

  • How does 4D improve cost certainty as well as time certainty?

    Programme delays almost always increase costs. By reducing risk and improving delivery efficiency, 4D helps you control both time and cost outcomes.

General FAQs

  • What is 4D Planning?

    4D Planning links a project schedule (time) to a 3D model (geometry), creating a visual simulation of construction sequences. It helps teams better understand the build process, identify risks early, and communicate clearly with all stakeholders.

  • Why should I use 4D Planning on my project?

    4D Planning reduces uncertainty by showing how the construction will unfold over time. It supports early risk detection, improves coordination between trades, and provides a powerful tool for client engagement, planning approvals, and site logistics.

  • What do I need to get started with 4D Planning?

    To begin, we typically need: A 3D model (e.g., from Revit, Rhino, Tekla, ArchiCAD, or IFC format). A construction schedule (from Primavera P6, Asta Powerproject, MS Project, or similar). Key project milestones and sequencing information. From there, we align your programme with the model and start building the 4D simulation.

  • Do I need a BIM model to benefit from 4D Planning?

    Not always. While BIM models make integration smoother, we can also use simplified geometry or massing models to represent key elements of the build. The level of detail depends on your project’s goals—sometimes simple is more effective.

  • How accurate does the programme need to be?

    A draft programme is fine as a starting point. 4D Planning can actually help refine your schedule by testing assumptions visually. The more accurate the programme, the more reliable the simulation will be.

  • How does 4D Planning support decision-making?

    By visualising the programme, stakeholders can see when and where activities overlap, understand crane and logistics strategies, and assess the impact of design changes before work begins onsite. It creates a “common language” between planners, designers, and delivery teams.

  • Can 4D Planning be updated during the project?

    Yes. 4D is not just for preconstruction—updating the model and programme throughout delivery provides real-time progress tracking, issue resolution, and powerful evidence for project reporting.

  • How long does it take to create a 4D model?

    It depends on project scale and detail. A simple 4D simulation can be prepared in days, while a detailed, fully coordinated 4D model for a large project may take weeks. We’ll scope timelines clearly before starting.

  • What types of projects benefit from 4D Planning?

    Any project with complex sequencing, logistics, or stakeholder engagement needs can benefit—from high-rise construction and infrastructure schemes to fit-outs, refurbishments, and manufacturing facilities.

  • What is the difference between 4D Planning and traditional planning?

    Traditional planning relies on written programmes and Gantt charts, which can be difficult to interpret. 4D combines time with 3D models, showing exactly how the project will be built, step by step, in a visual format.

  • What are common pitfalls when implementing 4D planning?

    The main pitfalls are not updating the model, poor data integration, and lack of team engagement. We avoid this by keeping models live, aligning programme and design, and running collaborative workshops.

  • What software is commonly used for 4D planning?

    The spine of our process is underpinned by SYNCHRO 4D, provided by Bentley Systems. We wrap various other softwares and processes around this depending on the specific project requirements.